India’s energy transition needs a decision layer.

A plain-language map of generation, transmission, grid operation, exchanges, open access and settlement—and where intelligent storage changes the outcome.

Real high-voltage substation and transmission infrastructure
India energy systemSystem view
The physical and commercial pathways togetherGeneration → grid → market → consumer
Installed capacity · Dec 2025513.73 GWIllustrative model output

India energy pulse

A bigger, cleaner grid needs a faster decision layer.

Installed-capacity figures are an official snapshot at 31 December 2025. Storage outlook is the CEA National Electricity Plan base case.

513.73 GWtotal installed capacity
135.81 GWsolar capacity
51.93%non-fossil capacity share
236.22 GWhBESS need by 2031–32
513.73GW installed
Thermal239.6 GW
Solar135.81 GW
Wind54.65 GW
Hydro50.97 GW
Nuclear + other32.7 GW

How electricity reaches a consumer

One physical flow. Several commercial hand-offs.

The grid moves electrons. Contracts, schedules and meters determine who pays whom—and how much.

Generate

Power is produced.

Solar, wind, hydro, thermal and nuclear plants inject electricity into the network.

Transmit

Voltage moves it far.

Inter-state and state networks carry bulk power toward consumption centres.

Operate

The grid stays balanced.

NLDC, RLDCs and SLDCs coordinate schedules, frequency and secure delivery.

Consume

The meter records reality.

DISCOM and open-access consumers draw power; schedule-versus-actual becomes settlement.

Real solar panels and wind turbines connected to the energy system
National grid intelligenceSystem view
Forecast → schedule → dispatch → meter → settlementPhysical delivery meets commercial intent

Open access, simply

Buy power from outside the local DISCOM supply arrangement.

Eligible consumers can procure from a generator, trader or exchange while paying the grid pathway and applicable policy charges.

EnergyExchange or PPA price
+
NetworkTransmission, wheeling and losses
+
PolicySurcharges, duty and banking
=
Delivered resultLanded cost

Explore the next generation of energy tools.

The landed cost calculator and BESS simulator are coming soon. Speak with our team about your asset in the meantime.

Coming soonCost intelligence

Landed cost calculator

Explore how energy prices, network charges, state charges and storage shape your landed energy cost.

  1. Energy price
  2. Network + state charges
  3. Storage scenario
Interactive tool in developmentView details
Coming soonAsset intelligence

BESS simulator

Compare how asset size, state of charge and a buyer, seller or merchant objective change the operating plan.

  1. Configure the asset
  2. Choose an objective
  3. Compare the schedule
Interactive tool in developmentView details

Model the decisions before you move the energy.

Bring the asset, site and objective. We will map the data boundary, twin and commercial decision flow.